Thursday 21 November 2013

Part V - Mission Accomplished - Before and After

After around full five weeks our bathroom renovation project was complete. Beautiful, functional and sleek , our new washroom is our relaxation spot now. It took quite some time but was totally worth it.

Just to recap I am going to list some materials that were used in the project in case somebody wants to imitate this great success:

1) Bathtub - Neptune Zen 3666 - Active Air
2) Faucets and Accessories - Riobel Zendo line
3) Floor tiles - Olympia Tile Regal Collection - colour : shell white matte - 12"x 12"
4) Wall tiles - Olympia Tile Archtech Collection - colour : Perlato - 12"x 24"
5) Accent tiles - Olympia Tile Archtech Collection- colour : Perlato - 1.00"x2.25"
6) Toilet - Toto Ultramax II
7) Sinks - Kholer - Ladena 18"x12"
8) Wall electrical fixtures - Modern Form LED -Royal Lighting


The following list of materials were provided by Parada Kitchens and Baths :

- Shower glass enclosure
- Countertop, bench and accents - Ceasar Stone Frosty Carrina
- Vanity and tub skirt
- Mirrors and medicine cabinet
- Electrical and plumbing supplies

Once again thank you Eno, Slavic and Mike for your excellent work and professionalism!

I also want to thank my son Fabian for brainstorming with me even before the project started and for providing his personal and professional support as an Architect.

And the most interesting part of this post are the before and after photos:


Bathroom before renovation:











Bathroom after renovation













And our bedroom was also painted and a new photographer's lamp added as an accent lighting.


Sunday 3 November 2013

Part IV- Fourth week - Almost there... :-)

Well, today Saturday November 2nd, pretty much a month since we started, I can say we are almost there. I have to recognize that I enjoyed the process. Seeing our new bathroom slowly being revitalized step by step was like a dream coming to life.

Needless to say I didn't enjoy looking for my clothes through different rooms in the house every morning or  to vacuum the floors every afternoon but " NO PAIN NO GAIN" is the motto here.

The fourth week was really exiting because all the aesthetic finishes became visible. Slavic finished the tiling , did part of the grouting , installed the tub with its corresponding faucets and finished painting the walls of the washroom.

The electrician came to connect some of the lights but he is not finished yet. The lights look amazing so far and I did try my bubling tub with an electrical extension, just looking at the bubles from the outside for now.

Today Eno came home to start the installation of the vanity and  also took the measurements for the countertop.  He ordered the glass panel and door for the shower too so, next week hopefully will be the final week for our bathroom renovation project. Yahooo!

 Once again I have to congratulate Slavic for his detailed oriented work and thank Eno very much for helping me design and direct the project and allow my so much dreamed washroom come to reality. Eno has shown that although we differ in styles and personalities, being mine more hectic and his a really Greek style: relaxed and calm he can get things done ( He looks as relaxed as somebody just watching at the Mediterranean Sea sometimes).

I have heard many times during the process :" Patricia you worry too much!" and may be I do.